Skip to main content

Link Road, Huyton, Liverpool

External Work

We started this project in August 2022, this lasted 12 months. This is our latest warehouse refurbishment, a design and build project consisting of splitting the warehouse into 7 self-contained units, each unit with its own entrance and parking.

Link Road, Huyton, Liverpool

Roofing Work

This started with the removal of all the old asbestos roof and cladding, installed an insulated composite panel to the roof including skylights and single skin sheets to the walls.

Link Road, Huyton, Liverpool

Internal Work

The internal work started with stripping out all mechanical and electrical to get the warehouse back to a bare shell. We painted all existing steels and built new jumbo stud walls to segregate each unit.

Link Road, Huyton, Liverpool

Office Work

We created an office space in each unit, each office having a different layout.

Link Road, Huyton, Liverpool

Kitchen and bathroom

In each of the 7 units we built both a male and female toilet and a disabled toilet. As well as a kitchen.